Todd Losee

President

Niswander Environmental

Todd Losee, is a Certified Professional Wetland Scientist (#1733), Instructor, Natural Resource Consultant and President of Niswander Environmental. Todd has worked as a private wetland consultant and ecologist for Niswander Environmental since 2013. As the President of Niswander Environmental, Todd oversees 10 staff coordinating a varying array of natural resource consulting projects and numerous large wetland and stream restoration/mitigation projects. During his time at Niswander Environmental, Todd has been instrumental in the development of 15 wetland mitigation banks and has restored several miles of stream channels, including being the project manager and prime contractor for the removal of the Milham Park Dam and the Brooklyn Dam. Prior to joining Niswander Environmental, Todd worked as a wetland, lakes and stream specialist for 15 years with the Michigan Department Environment, Great Lakes, and Energy (EGLE). Todd has served as a MWA Board member, past- MWA President, and is currently co-chair of the MWA Training Subcommittee. From 2014-2023, Todd co-instructed FW 417, Wetlands Ecology and Management, at Michigan State University.


TSN Conference 2027

January 22nd, 2027 (Friday) // 11:20 – 11:45 am // Room 105 // Reconnecting the Upper River Raisin: A case study of the Brooklyn Dam removal // There are more than 60 dams located in the River Raisin watershed; including the Brooklyn Dam, which has caused significant impairments to stream connectivity, aquatic organism passage, and high-quality habitat in this reach of the River Raisin for almost 80 years. This presentation will highlight the removal of the Brooklyn Dam (a high hazard potential dam), replacement of the Mill Street Bridge and small integrated dam underneath, and the restoration of more than 2,600 feet of stream channel; collectively referred to as the Upper River Raisin Watershed Restoration and Connectivity Project. The presentation will discuss how the project came to be, tips for working with multi-agency stakeholders, how several years of community outreach and public engagement impacted the project, the state and federal permitting experience, design and construction approaches used to integrate wetland and stream restoration components, and highlight lessons learned.